What construction debris removal can include
Construction debris should be sorted and described before pickup because weight and material type affect the load.
- Wood, drywall, fixtures, and packaging
- Metal and masonry separated where practical
- Debris from a defined repair or renovation area
Prepare the job before pickup
Keep paint, chemicals, batteries, fluorescent lamps, and suspect asbestos-containing material out of the pile.
Send photos that show the items and the full path to the loading area. The crew will confirm the scope, access, and price before approved work begins.
Need help deciding what belongs in the load?
Review the items we take and the listed exclusions. If your item is not shown, call before moving it.